tracking pixel

Chat with Us

Revised Orange Line Construction Detour At Decatur & 28th

Start Date:09/17/2024
End Date:03/16/2025
Reason:Construction At 28th & Decatur
Duration:03/16/2025
Routes Effected:
  • Orange Line
Stops Effected:

Passengers may resume making their connections with the Orange Line at 28th & Commerce bus stops, heading to North Side Station  and to Fort Worth Central Station, effective 9/17/24.

Orange Line to NSS
From Main
Right – 28th
Left – Nichols
Right – 29th
Right – Decatur into NSS

Orange Line to FWCS
From NSS
Left – Decatur
Left – 28th
Left – Nichols
Right – 28th
Regular Route