tracking pixel

Route 12 Detour Bridge Construction Detour At Deen & Long

Start Date:04/10/2023
End Date:12/31/2024
Reason:Bridge Construction
Duration:Estimated End Date: NOV 2024
Routes Effected:
Stops Effected:

Route 12 – Outbound

From Deen

Left – 33rd (First Street passed RR Tracks)

Veer Right onto street before underpass

Veer Left onto Long Ave

Regular Rt.

 

Route 12 – Inbound

From Long Ave

Left – Schawrtz

Right – 36th 

Right – Deen (Crossover Long)

Regular Rt.

 

Temp Stop Located at Terra Ct & Deen

Bus Stops closed: Long & Schwartz (Inbound), Deen & Long (Inbound & Outbound)