Start Date:04/10/2023
End Date:12/31/2024
Reason:Bridge Construction
Duration:Estimated End Date: NOV 2024
Routes Effected:
Stops Effected:
Route 12 – Outbound
From Deen
Left – 33rd (First Street passed RR Tracks)
Veer Right onto street before underpass
Veer Left onto Long Ave
Regular Rt.
Route 12 – Inbound
From Long Ave
Left – Schawrtz
Right – 36th
Right – Deen (Crossover Long)
Regular Rt.
Temp Stop Located at Terra Ct & Deen
Bus Stops closed: Long & Schwartz (Inbound), Deen & Long (Inbound & Outbound)