tracking pixel

Chat with Us

28th & Decatur Street Closure (Long Term)

Start Date:06/17/2024
End Date:03/09/2026
Reason:Construction
Duration:3.9.25
Routes Effected:
  • 091
Stops Effected:

Bus Stops Missed: 28th & Commerce (Eastbound & Westbound) 

Passengers are encourgaed to utilize the  Bus Stops on Main St or North Side Train Station to make their connections  on the Route  91. 

Route 91 to NSS
From 28th
Left – Main
Right – Long
Right – Decatur into NSS

Route 91 to Normandale & Bridgehill
From NSS
Left – Decatur
Left – Long
Left – Main
Left – 28th
Regular Route