March 8, 2018
GRAPEVINE, TEXAS – The eastbound lanes of State Highway 114 east of Texan Trail will be closed beginning at 8 p.m. Saturday, March 10, and will reopen at 5 a.m. Sunday, March 11, while construction continues on the new TEXRail train bridge from Grapevine into Dallas Fort Worth International Airport. During that time, concrete beams will be placed on the new pillars for the bridge.
This is the first closure needed for installing beams and constructing the 1,400-foot-long bridge over the next couple months. The new bridge will have one track for TEXRail and is being built with the ability for a second set of tracks to be installed.
Additionally, eastbound State Highway 114 (connector ramp) frontage road between Texan Trail and International Parkway will be closed between 8 p.m. Monday, March 12, and 5 a.m. Tuesday, March 13.
Detours will be:
- From State Highway 121 northbound – vehicles will be directed to exit at the Main Street / Texan Trail exit. Vehicles will continue down the frontage road past Texan Trail and will be able to enter State Highway 114 again prior to International Parkway.
- From State Highway 114 southbound – vehicles will be directed to exit at the Texan Trail exit. Vehicles will continue down the frontage road past Texan Trail and will be able to enter State Highway 114 again prior to International Parkway.
Detour: